Unfortunately, the school has experienced a major setback and indeed a complete collapse as the proprietor aged and lacked a support system to keep this great idea realizing more life in the future. The covid-19 pandemic disrupted the school and could not weather through the pandemic with its overhead costs, which to me is a dark cloud on my lovely village Nambute. I would wish to see more kids realizing their potential in life given a chance that can only be assured through education. The villages lack an immediate and nearby alternative without this school.

It is with this heartfelt concern that I wish to give back to the village and place that raised me. In agreement with the proprietor, the school was transferred to Rodmakuway Ltd, with the view to revamping it to a better standard and a sustainable one.  we dream of a model pre-primary and primary school that will interest people from near and far.

The school lacks up-to-date curriculum textbooks and teaching materials, furniture for kids and staff, teaching materials, qualified teachers, support staff, and administration. The schools’ existing buildings need renovation, and more infrastructure like staff quarters, dining hall, and administrative building is required

Our humble appeal goes to the good citizens of the World who identify with our need, to lend us a hand with anything possible while we revamp our Nambute Parents’ School so that the children of Nambute village dwellers can realize their full potential, become responsible citizens of the World, and contribute to humanity. We have a great idea of transforming this school to include a boarding section. It is in a good learning environment, and we want our village kids to have a cultural interaction with the rest of the world. We thank you in advance and we want to pledge our transparency and accountability with every penny, Many thanks.

Item No. Item Description Cost/US$
1 Renovation Entire School and Administrative block 25,000
2 Administrative block Offices, staff room, and library 35,000
3 School Main Hall Main Hall and dormitory 20,000
4 Staff quarters 7 housing units 25,000
5 Furniture Desks, Chairs, lockers, and tables 15,000
6 Staffing Teachers, administrators, and support staff for the first year 20,000
7 Stationery UpToDate textbooks, reference materials, and educational materials 17,500
8 Feeding breakfast for preprimary and lower primary and lunch for upper primary 3,000
9 Physical education facility There is land for the playground that needs to be established. 7,000
10 Toilet Construction of school and staff quarter toilets (for boys, girls, staff, and quarters) 13,500
11 Tap Water Connecting school to National water grid 19,500
12 Electricity Connecting school to National power grid 5,000
13 Kitchen & Store School Kitchen, Dining, and food store 20,000
  Total $.225,500